On the morning of April 11, a batch of portable drilling rigs machines passed the inspection in Shandong China Coal Group Intelligent Equipment Manufacturing Workshop, formally loaded and shipped to a
Many factors will cause pneumatic rock drill failures because of poor lubrication, here are some common reasons and troubleshootings 1. Oil hole of oil injector was blocked, should be cleaned after t
. Malaysian merchants expressed their satisfaction and signed a water well drilling rig ordering contract on the spot. Both parties formally reached long-term strategic cooperation and signed a memora
Gas and water Malfunction failures of air leg rock drill are mainly due to: high water pressure, gas and water blocked, water valve spring failure, leakage, leakage, apron failure, parts of the valve
Malaysian Businessmen visited Shandong China Coal Group for long-term strategic cooperation on borehole drilling rig
The Association of Taiwan Investment Enterprises on the Mainland leaders, totally 24 persons came to Shandong China Coal Group e-commerce industrial park for investigation, China Coal Group Executiv
© Shandong China Coal Group. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Linda Zhang