Recently, orders from all over the country have been coming in, and China Coal Group has once again ushered in the peak of delivery. on March 18th, a truck full of high-quality suspended hydraulic pil
Spring is full of life, everything is reviving. In this season full of vitality, China Coal Group ushered in the peak of shipments. On March 4, a mining car and a platform suspension single hydraulic
The cold winter months China Coal Group to meet the peak shipment. On December30, after loading a number of products such as single hydraulic prop, construction grouting machine and dispatching winch
In October of autumn, China Coal Group ushered in the peak delivery period, and on October 7, the trucks loaded with brand-new water well drilling rigs were ready to be loaded in the delivery area, re
Rushing production, busy delivery, in this September full of vitality and vigor, China Coal Group ushered in the peak delivery period. 11th September afternoon, the big trucks full of brand new equipm
On August 17th, Pneumatic Pavement Breaker was loaded in the intelligent equipment production and manufacturing workshop of China Coal Group, and then it will be sent to Jincheng, Shanxi Province. Ove
© Shandong China Coal Group. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Linda Zhang