On September 3, two vehicles of fixed mining equipment were loaded in the intelligent equipment manufacturing workshop of China Coal Group, and then sent to a mine in Datong, Shanxi. The fixed mine ca
On August 26, a batch of Fixed Mining Car equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and sent to a mine in Xining, Qinghai. The Fixed Mining Car shipp
On August 21, a batch of mining flat cars was loaded in the second workshop of China Coal Group's intelligent equipment production and manufacturing and then will be sent to a mine in Guizhou. Over th
After the work is completed, clean and conceal the entire machine, especially the radiator, engine, hydraulic components and other parts.
The water well drilling rig is a complex machine composed of machines, units and mechanisms. Water well drilling rigs are mechanical equipment that drives drilling tools to drill underground to obtain
On August 13, a batch of single hydraulic props for mining are loaded in the third and fourth workshops of China Coal Group's intelligent equipment production and manufacturing, and then will be sent
© Shandong China Coal Group. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Linda Zhang