Notice:Welcome to Shandong China Coal Group! Credibility is life, the quality strives for survival" is the principle that all staff!
Position: Home » Product Wiki & Info » What Are The Maintenance Of Water Well Drilling Rig Tracks

What Are The Maintenance Of Water Well Drilling Rig Tracks

780 Date: 2020-09-10 Tag: Water Well Drilling Rig Tracks
The track of the water well drilling rig is composed of track shoes and track pins. The track pin connects each track shoe to form a track chain link. There are holes at both ends of the track shoe of the water well drilling rig, which mesh with the driving wheel, and there are inducing teeth in the middle to correct the track. ) To improve the firmness of the track shoe and the adhesion between the track and the ground. There are also supporting wheels, supporting wheels, driving wheels and rail links on the water well drilling rig site.

When cleaning the water well drilling rig, the sludge on the lower walking body should be cleaned at the same time. After the operation, the operator should clean the sludge on the lower walking body while cleaning the cab, if there is sludge attached to the lower walking body . It is impossible to check related parts. Therefore, please be sure to remove these sludge and inspect and maintain the lower walking body.

During the construction of the water well drilling rig, the crawler tension should be adjusted according to the soil quality to cope with the differences in soil quality at different construction sites. Doing so can also extend the service life of the machine. When the soil is soft, soil is easy to adhere to the track and rail link. Therefore, the crawler should be adjusted slightly to prevent abnormal stress on the rail link due to the attachment of soil. When the water well drilling rig is on a construction site full of pebbles, the crawler should also be adjusted slightly, so that when walking on the pebbles, the crawler shoe can be avoided from bending. When the ground is firm and flat, it is best to adjust the track slightly tighter. Adjustment of crawler tension of water well drilling rig: If the crawler is too tight, the walking speed and walking power will decrease. This will not only cause a decrease in work efficiency, but also cause abnormal wear due to excessive friction applied to the pin and bushing. On the contrary, if the track of the water well drilling rig is adjusted too loosely, the track will slack on the driving wheel and the supporting wheel, causing greater wear or damage. Moreover, when the loose track sags too much, it may come into contact with the frame and damage the frame. In this way, even if it is a reinforced lower walking body, if it is not adjusted correctly, it will cause unexpected failures.

What Are The Maintenance Of Water Well Drilling Rig Tracks

What Are The Maintenance Of Water Well Drilling Rig Tracks