Operators of
water well drilling rigs should receive training and guidance from the manufacturer, have a full understanding of the structure and performance of the drilling rig, and obtain certain operation and maintenance experience before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the operation and maintenance manual and operate and maintain according to the requirements of the manual.
Pay attention to the work load during the running-in period of the
water well drilling rig. Generally, the work load during the running-in period should not exceed 80% of the rated work load, and a suitable workload should be arranged to prevent overheating caused by the machine's long-term continuous operation. Pay attention to frequently observe the indicators of the water well drilling rig. If there is any abnormality, stop it in time to eliminate it. If the cause is not found, the operation should be stopped before the fault is eliminated.
For
water well drilling rigs, pay attention to frequently checking the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water), and pay attention to checking the airtightness of the whole machine. Excessive oil and water shortage is found during the inspection, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requirements). Keep the machine clean, adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the parts to be lost.
At the end of the running-in period of the
water well drilling rig, the machine should be subject to mandatory maintenance, inspection and adjustment should be done, and attention should be paid to the replacement of oil. In short, the maintenance requirements of water well drilling rigs during the running-in period can be summarized as: load reduction, attention to inspection, and enhanced lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve work efficiency, and bring you more economic benefits.