The construction of
water well drilling rigs must be carried out in strict accordance with the drilling location and direction, angle, water well drilling quality and drilling depth. Unauthorized changes to the device are prohibited. When installing the drill pipe on the water well drilling rig, please check the hydraulic water well drilling rig to ensure that the drill pipe is not blocked, not bent, and not ground steel wire.
There are four items that need to be paid attention to when operating
water well drilling rig equipment. First of all, when entering the construction site, the drilling rig needs to be fixed on the drilling rig. The area of the drilling rig is larger than the seat of the drilling rig, and there must be sufficient safety space around it. Secondly, when installing the drill pipe, check the drilling equipment to make sure that the drill pipe is not blocked, bent, and the steel wire is not worn. Please do not prohibit the drill pipe. Third, drilling equipment must master the working principle and comprehensive maintenance knowledge of drilling equipment, and there are many troubleshooting methods. Fourth, drilling equipment should be tightly loaded, turning or ramps should be slowed down and fixed with steel wires.
Water well drilling rigs are widely used in large, medium and small mines, hydropower, transportation, national defense projects and other earth and stone excavation and blasting projects, and can also be used for underwater rock drilling and blasting operations such as harbors and waterways. Percussion water well drilling rigs are widely used in large-diameter and deep-hole operations such as water wells and geothermal air conditioning drilling. Our company has a comprehensive after-sales service and maintenance network to provide customers with strong sales support, and our products are favored by customers at home and abroad.