1.Calculate whether the pressure pipeline is overloaded. If it is overloaded, the number of working machines can be reduced according to the actual situation, or other gas consumption project can be reduced.
2.Eliminate the pressure drop caused by pipe leakage, checak and replace leak lines and fittings.
3.Gas hose length should be controlled between 10m-15m, check and replace the small air pipe diameters and valve switches.
4.Avoid line pressure drop.